HURRICANE AND FLOOD DESIGN INTEGRATION

8.png

1. FOUNDATIONS

5. SECONDARY CONCRETE FLOORPLATE

11.png
7.png

2. CONCRETE PILLARS INSTALLED

2.png

6. SECOND LEVEL OF MODULES INSTALLED

9. SAFETY RAILING INSTALLED 

10.png
5.png

3. ELEVATED CONCRETE FLOORPLATE

1.png

7. CONCRETE ROOF PLATE

9.png
4.png

4. MODULES INSTALLED

8. WINDOWS AND BRISE SOLEIL INSTALLED

10. COMPLETION AND USE